Public Jobs

Bids due in 2 days
10/28/20 10:00 am
Johnston Community College - Engineering Building
Barnhill Contracting Company
Smithfield, NC
This project consists a new two-story 46,365 SF. The Building will include Classrooms, Teaching Labs, a Lecture Hall, a Multipurpose Room, Administrative Offices, and Support Space for the Mathematics, Engineering and Technology-Focused Courses. The Building will be a steel-framed Type II-B construction, fully sprinklered, with a primary business occupancy. The Scope of work includes associated Site and Utility improvements
Bids due in 24 days
11/19/20 2:00 pm
College of Albemarle - Dare County Campus - Phase III
Barnhill Contracting Company
Manteo, NC
This project consists of the New College of the Albemarle Center Structure in Manteo NC. This project includes the construction of a 36,500 square foot two-story building with an all new site utilities package. Construction includes the removal of existing slab on grades (5) and site utilities currently onsite. The new construction includes, slab on grade, structural steel framing, Metal wall framing, CMU walls, steel joist, with metal roofing panels. Exterior veneer includes brick, fiber cement panel systems, aluminum storefronts, and metal panel roof system. Interior partitions are steel stud with gypsum board and CMU constructed. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping.
Bidding Closed
10/13/20 12:00 pm
Bailey Village at New Downtown East
Barnhill Contracting
Greensboro, NC
Barnhill Contracting has been selected to bid on a new development to include multifamily and retail in Greensboro, NC. The new development is to be called Bailey Village at New Downtown East. The rebirth of this area is adjacent to Bennett College and in close proximity to UNCG and downtown. The multi-family complex is four buildings, 172 units, 272,060 SF. This work is scheduled to occur over a 15-month period.
E41 Apex Friendship Elementary School
Barnhill Contracting
Apex, NC
This project consists of the new construction of the Apex Friendship Elementary School for Wake County Public Schools constructed on an existing campus of approximately 82 acres, located at 7801 Humie Olive Road, Apex, NC 27502. On-site and off-site construction shall consist of grading, storm drainage, utilities, site improvements, paving, landscaping, retaining walls, and fencing. The new building is a 129,790 sf, 3-level elementary school with shallow CIP concrete foundations, structural steel structure. The building envelope consists of brick veneer on CMU masonry backup with spray foam insulation, brick veneer on metal stud backup with spray foam insulation, or metal panels on metal stud backup with spray foam insulation, and Mod bit roofing over lightweight insulation concrete system. Typical building interiors include CMU partitions, GWB partitions and assemblies, acoustical ceilings, PLAM casework, painting, flooring, and building specialties.
NCCU New School of Business
Barnhill Contracting
Durham, NC
This project includes construction of a new approximately 75,000sf 4-story collegiate building for the NCCU New School of Business. It is located on Alston Avenue in Durham, NC. The site is partially occupied by vacant dwellings. CIP concrete foundations and all steel structure with masonry, glass, and metal panel cladding. Interior is CMU & metal stud GWB partitions with acoustical ceilings, manufactured casework, resilient and tile flooring, painting, and wallcoverings, and Div 10 specialties. Wet and dry pipe sprinkler with fire pump. Four pipe, VAV mechanical system. Turnkey electrical including A/V and security
FTCC Regional Fire & Training Center
Barnhill Contracting Company
Fayetteville, NC
Work includes construction of a new 1 story 24,000 sf classroom building with mezzanine and three bay fire apparatus bay. Classroom building consists of offices, locker rooms, simulation lab space and classrooms. The building consists of aggregate pier foundations, structural steel and load bearing masonry with small mezzanine, metal deck roof, with single-ply PVC Membrane Roofing. The skin will be metal studs, sheathing, air barrier, masonry and metal panels, including Curtainwall and Storefront windows. Interiors will be resilient, carpet, and ceramic tile flooring, drywall and acoustical ceilings, wood doors and hardware, casework, operable partitions, and signage. Site structures include 3 story 4,393 sf Burn Building with cast-in place concrete, thermal linings and exterior stair; 4 story 3,420 sf Training Tower with load bearing masonry, concrete floor slabs and exterior stair; Technical Rescue feature with cast-in place concrete elements for trench and confined space training. The civil work consists of site clearing, earthwork, site utilities, asphalt paving along with concrete paving. Landscaping consists of seeding/sod and irrigation and project fencing and gates.
Northern High School
Barnhill Contracting
Durham, NC
The new Northern High School (NHS) will replace the existing Northern High School for Durham Public Schools. NHS is a new construction project at 4622 & 4804 Roxboro Road and will include site clearing, site development and new high school construction. The building will provide 85 teaching spaces, support extensive and robust Career and Technical Education programs as well as support full Athletics and Performing Arts programs. Site development will include stream crossings, construction of a Stadium, Track, Tennis Courts, Ball Fields and a Competition Field.
Bids due tomorrow at 2:00pm
10/27/20 2:00 pm
College of Albemarle - Dare County Campus - BP3100
Barnhill Contracting Company
Manteo, NC
This project consists of the New College of the Albemarle Center Structure in Manteo NC. This project includes the construction of a 36,500 square foot two-story building with an all new site utilities package. Construction includes the removal of existing slab on grades (5) and site utilities currently onsite. The new construction includes, slab on grade, structural steel framing, Metal wall framing, CMU walls, steel joist, with metal roofing panels. Exterior veneer includes brick, fiber cement panel systems, aluminum storefronts, and metal panel roof system. Interior partitions are steel stud with gypsum board and CMU constructed. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping.
Bids due in 3 days
10/29/20 2:00 pm
Pitt Community College - Student Advancement Center
Barnhill Contracting
Winterville, NC
This project consists of new construction of the Pitt Community College Student Advancement Center. The project includes the construction of a 40,000 square foot two-story building with equipment platform. Construction includes slab on grade, structural steel framing and truss system, metal panels with brick and select precast, TPO, asphalt shingle roof and metal panel roof system. Interior partitions are steel stud with gypsum board. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping