Public Jobs

Wilson Academy of Applied Technology(WAAT)
Barnhill Contracting Company
Wilson, NC
This project consist building consists of approximately 83,0000 sf two story building that will provide technical pathway options for Wilson County School Students. Construction includes the removal of existing asphalt and site utilities currently onsite. The new construction includes site utilities, asphalt paving, slab on grade, slab on metal deck, structural steel framing, metal wall framing, CMU walls, and TPO roofing system. Exterior includes brick veneer, metal wall panels, aluminum storefronts and TPO roofing system. Interior partitions are metal studs with gypsum board and CMU constructed. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping
Bidding Closed
12/8/20 5:00 pm
NCSSM - Western Campus BP2700 & BP2800
Barnhill Contracting Company
Morganton, NC
The first phases of bidding and construction are under way. Campus site preparation, demolition, and 4 of the 6 buildings on the 21-acre campus are contracts which have been awarded in 2019 and early 2020
E41 Apex Friendship Elementary School
Barnhill Contracting
Apex, NC
This project consists of the new construction of the Apex Friendship Elementary School for Wake County Public Schools constructed on an existing campus of approximately 82 acres, located at 7801 Humie Olive Road, Apex, NC 27502. On-site and off-site construction shall consist of grading, storm drainage, utilities, site improvements, paving, landscaping, retaining walls, and fencing. The new building is a 129,790 sf, 3-level elementary school with shallow CIP concrete foundations, structural steel structure. The building envelope consists of brick veneer on CMU masonry backup with spray foam insulation, brick veneer on metal stud backup with spray foam insulation, or metal panels on metal stud backup with spray foam insulation, and Mod bit roofing over lightweight insulation concrete system. Typical building interiors include CMU partitions, GWB partitions and assemblies, acoustical ceilings, PLAM casework, painting, flooring, and building specialties.
NCCU New School of Business
Barnhill Contracting
Durham, NC
This project includes construction of a new approximately 75,000sf 4-story collegiate building for the NCCU New School of Business. It is located on Alston Avenue in Durham, NC. The site is partially occupied by vacant dwellings. CIP concrete foundations and all steel structure with masonry, glass, and metal panel cladding. Interior is CMU & metal stud GWB partitions with acoustical ceilings, manufactured casework, resilient and tile flooring, painting, and wallcoverings, and Div 10 specialties. Wet and dry pipe sprinkler with fire pump. Four pipe, VAV mechanical system. Turnkey electrical including A/V and security
FTCC Regional Fire & Training Center
Barnhill Contracting Company
Fayetteville, NC
Work includes construction of a new 1 story 24,000 sf classroom building with mezzanine and three bay fire apparatus bay. Classroom building consists of offices, locker rooms, simulation lab space and classrooms. The building consists of aggregate pier foundations, structural steel and load bearing masonry with small mezzanine, metal deck roof, with single-ply PVC Membrane Roofing. The skin will be metal studs, sheathing, air barrier, masonry and metal panels, including Curtainwall and Storefront windows. Interiors will be resilient, carpet, and ceramic tile flooring, drywall and acoustical ceilings, wood doors and hardware, casework, operable partitions, and signage. Site structures include 3 story 4,393 sf Burn Building with cast-in place concrete, thermal linings and exterior stair; 4 story 3,420 sf Training Tower with load bearing masonry, concrete floor slabs and exterior stair; Technical Rescue feature with cast-in place concrete elements for trench and confined space training. The civil work consists of site clearing, earthwork, site utilities, asphalt paving along with concrete paving. Landscaping consists of seeding/sod and irrigation and project fencing and gates.
Northern High School
Barnhill Contracting
Durham, NC
The new Northern High School (NHS) will replace the existing Northern High School for Durham Public Schools. NHS is a new construction project at 4622 & 4804 Roxboro Road and will include site clearing, site development and new high school construction. The building will provide 85 teaching spaces, support extensive and robust Career and Technical Education programs as well as support full Athletics and Performing Arts programs. Site development will include stream crossings, construction of a Stadium, Track, Tennis Courts, Ball Fields and a Competition Field.