Wilson Academy of Applied Technology(WAAT)

This project consist building consists of approximately 83,0000 sf two story building that will provide technical pathway options for Wilson County School Students. Construction includes the removal of existing asphalt and site utilities currently onsite. The new construction includes site utilities, asphalt paving, slab on grade, slab on metal deck, structural steel framing, metal wall framing, CMU walls, and TPO roofing system. Exterior includes brick veneer, metal wall panels, aluminum storefronts and TPO roofing system. Interior partitions are metal studs with gypsum board and CMU constructed. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping

Status

Bidding Closed

Bid Date7/8/21 1:00 pm

Company & Contacts

Barnhill Contracting Company

Conner Crawford ccrawford@barnhillcontracting.com   919.781.7210

Location

Wilson, NC

ReBid Day Information:
Date: 7/8/2021 1:00PM
Location: Darden Middle School (1655 Lipscomb Road East, Wilson, NC 27893)

Live streamed via Zoom:
https://barnhillcontracting.zoom.us/j/85834574477
Meeting ID: 858 3457 4477

See the following SCOPES OF WORK for Thursday July 8th 1:00PM: BP-750 – Metal Wall Panels, BP-840 – Curtainwall/Storefront/Glass/Glazing, BP965 – Wood Flooring, BP1053 – Awings & Canopies, BP1232 – Laboratory Casework BP-1250 – Window Treatments, BP1420 – Elevators, BP-2100 – Fire Protection, BP-2200 – Plumbing Systems