Wilson Academy of Applied Technology(WAAT)

This project consist building consists of approximately 83,0000 sf two story building that will provide technical pathway options for Wilson County School Students. Construction includes the removal of existing asphalt and site utilities currently onsite. The new construction includes site utilities, asphalt paving, slab on grade, slab on metal deck, structural steel framing, metal wall framing, CMU walls, and TPO roofing system. Exterior includes brick veneer, metal wall panels, aluminum storefronts and TPO roofing system. Interior partitions are metal studs with gypsum board and CMU constructed. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping

Prequalification Deadline: 2/19/2021

MWBE Information Session: 2/15/2021 11:00AM

Join Zoom Meeting
https://barnhillcontracting.zoom.us/j/88349197516

Meeting ID: 883 4919 7516