College of Albemarle - Dare County Campus - Phase III

This project consists of the New College of the Albemarle Center Structure in Manteo NC. This project includes the construction of a 36,500 square foot two-story building with an all new site utilities package. Construction includes the removal of existing slab on grades (5) and site utilities currently onsite. The new construction includes, slab on grade, structural steel framing, Metal wall framing, CMU walls, steel joist, with metal roofing panels. Exterior veneer includes brick, fiber cement panel systems, aluminum storefronts, and metal panel roof system. Interior partitions are steel stud with gypsum board and CMU constructed. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping.

Status

Accepting Bids

Prebid Date10/22/20 2:00 pm

Bid Date11/19/20 2:00 pm

Company & Contacts

Barnhill Contracting Company

Clint Hardison chardison@barnhillcontracting.com   252.802.0740

Location

Manteo, NC

Pre-Bid Meeting Information:

Meeting will be held via Zoom on 10/22/2020 at 2:00pm
Join Zoom Meeting
https://barnhillcontracting.zoom.us/j/88086890698
Meeting ID: 880 8689 0698

Bid Day Information:

Barnhill Contracting Company will receive, open, and read publicly all bids received with the virtual viewing at the link below:
Nov 19, 2020 02:00 PM Eastern Time
Join Zoom Meeting
https://barnhillcontracting.zoom.us/j/89246524336

Meeting ID: 892 4652 4336
+13126266799,,89246524336# US (Chicago)
+14702509358,,89246524336# US (Atlanta)