Pitt Community College - Student Advancement Center

This project consists of new construction of the Pitt Community College Student Advancement Center. The project includes the construction of a 40,000 square foot two-story building with equipment platform. Construction includes slab on grade, structural steel framing and truss system, metal panels with brick and select precast, TPO, asphalt shingle roof and metal panel roof system. Interior partitions are steel stud with gypsum board. Construction includes sprinkler, plumbing, mechanical, electrical systems along with related site development and landscaping

Status

Accepting Bids

Prebid Date9/22/20 2:00 pm

Bid Date10/13/20 2:00 pm

Company & Contacts

Barnhill Contracting

Kaitlin Rouse krouse@barnhillcontracting.com   252.675.0576

Location

Winterville, NC

Pre-Bid Meeting Information:

Pitt Community College – Student Advancement Center Time: Sep 22, 2020 02:00 PM Eastern Time

Join Zoom Meeting
https://barnhillcontracting.zoom.us/j/87259746844

Meeting ID: 872 5974 6844
One tap mobile
+13126266799,,87259746844# US (Chicago)
+14702509358,,87259746844# US (Atlanta)

Dial by your location +1 312 626 6799 US (Chicago) +1 470 250 9358 US (Atlanta) +1 646 518 9805 US (New York) +1 786 635 1003 US (Miami) +1 213 338 8477 US (Los Angeles) +1 346 248 7799 US (Houston)
Meeting ID: 872 5974 6844
Find your local number: https://barnhillcontracting.zoom.us/u/kevibjh9MI

Join by SIP
87259746844@zoomcrc.com

Join by H.323
162.255.37.11 (US West)
162.255.36.11 (US East)
Meeting ID: 872 5974 6844