EBCI Youth Center

The EBCI Youth Center consists of the construction of a two level, 53,800 square foot, steel frame building with administrative offices, classrooms, library, multipurpose room with a gym and a kitchen with an open cafeteria. The project also includes an intensive site package including earthwork, site utilities, storm drainage, landscaping, paving and hardscape. Construction is scheduled to start in April 2020 with a completion date in June of 2021.
  Modular Campus Drawings (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Bid Set - Mod Campus 01.10.2020 10.5 MB
DBI-8587 NC plans 1.2 MB
Site Plan-1-OVERALL 1-9-2020-With Field Office 489.9 KB