EBCI Cherokee Youth Center

The EBCI Youth Center consists of the construction of a two level, 53,800 square foot, steel frame building with administrative offices, classrooms, library, multipurpose room with a gym and a kitchen with an open cafeteria. The project also includes an intensive site package including earthwork, site utilities, storm drainage, landscaping, paving and hardscape. Construction is scheduled to start in August 2020 with a completion date in March of 2022.
  Bid Manual (click to expand/collapse)
Name Size
000 Bid Manual 11.0 MB
  Drawings (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
(020) General 21.2 MB
(021) Civil 18.9 MB
(022) Structural 7.6 MB
(023) Architectural 35.8 MB
(024) Mechanical 16.5 MB
(024) Plumbing 18.7 MB
(025) Fire Protection 6.5 MB
(026) Electrical 32.2 MB
(027) Food Service 771.8 KB
018660_Cherokee Youth Center - Construction Documents 158.2 MB
  Existing Conditions Drone Photos (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
DJI_0513.JPG 8.8 MB
DJI_0514.JPG 8.9 MB
DJI_0517.JPG 8.3 MB
DJI_0522.JPG 8.0 MB
DJI_0524.JPG 8.1 MB
DJI_0525.JPG 8.1 MB
DJI_0528.JPG 8.2 MB
DJI_0535.JPG 8.2 MB