EBCI Cherokee Youth Center

The EBCI Youth Center consists of the construction of a two level, 53,800 square foot, steel frame building with administrative offices, classrooms, library, multipurpose room with a gym and a kitchen with an open cafeteria. The project also includes an intensive site package including earthwork, site utilities, storm drainage, landscaping, paving and hardscape. Construction is scheduled to start in August 2020 with a completion date in March of 2022.
  BCC.BG Addendum 1 (click to expand/collapse)
Name Size
CYC Addendum-1 BG-BCC JV 118.8 KB
  BCC.BG Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 2 - Revised Scopes & Bid Manual 1.5 MB
Form of Bid Bond 112.5 KB
  McMillan.Pazdan.Smith - Addendum 1 (click to expand/collapse)
Name Size
CYC - Addendum 01-Architect 610.7 KB
  McMillian.Pazdan.Smith - Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
00 01 01 - Table of Contents Rev 02 127.5 KB
012300 - ALTERNATES Rev 02 85.8 KB
033000 FL - Cast-In-Place Concrete Rev 02 175.6 KB
A010 - ARCHITECTURAL SITE PLAN 611.3 KB
A012 - SITE DETAILS 794.7 KB
A013 - SITE DETAILS 508.2 KB
A310 - ENLARGED EXTERIOR ELEVATIONS 393.8 KB
A400 - ENLARGED PLANS 368.4 KB
A610 - SECTION DETAILS 755.0 KB
A800 - DOOR SCHEDULE AND ELEVATIONS 563.1 KB
A821 - STOREFRONT AND CURTAINWALL ELEVATIONS 315.8 KB
APPENDIX D - Asbestos Survey Report 13.3 MB
APPENDIX E - Lead Paint Survey Report 9.1 MB
CYC - Addendum 02 27.1 MB