Harding H.S. Addition & Renovation

Project consists of a new 27,500 SQFT gym-concrete masonry unit load bearing structure which includes locker rooms, lobby/exhibition spaces and public restrooms. In addition to the new building, there will be renovations to the existing gym and locker rooms that will consist of MEP and finish upgrades. The existing cafeteria will receive a new freezer/cooler as well as sitework including new parking lots and building related grading and paving.
  Specifications (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
HUHS_PM Vol 1_100 CD_190314 37.9 MB
HUHS_PM Vol 2_100 CD_190314 9.7 MB