Harding H.S. Addition & Renovation

Project consists of a new 27,500 SQFT gym-concrete masonry unit load bearing structure which includes locker rooms, lobby/exhibition spaces and public restrooms. In addition to the new building, there will be renovations to the existing gym and locker rooms that will consist of MEP and finish upgrades. The existing cafeteria will receive a new freezer/cooler as well as sitework including new parking lots and building related grading and paving.
  Bid Manual (click to expand/collapse)
Name Size
Harding Bid Manual 4.5.2019 20.1 MB
  Drawings (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
HUHS_Addndm1_Sheets 59.7 MB
HUHS_Addndm2_Sheets 3.0 MB
HUHS_DWGS Vol 1_100 CD_190314 127.6 MB
HUHS_DWGS Vol 2_100 CD_190314 (1) 35.6 MB