Greenville Utilities Commission

This project includes the construction of three buildings of a total of approximately 142,000 sq ft. Construction includes slab on grade, structural steel, and brick and architectural CMU veneer, TPO roof system, and pre-engineered metal buildings. There will be a fuel island constructed and aluminum canopies. Interior partitions are metal stud with gypsum board.
  Bid Drawings (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
01 Front End 11.9 MB
02 Civil 146.1 MB
03 Engineering and Operations Building 75.1 MB
04 Systems Support Building 52.7 MB
05 Central Stores Warehouse 37.9 MB
BULK MATERIAL BIN 1.3 MB
DUMPSTER ENCL 1.8 MB
EQUIP BLDG A 4.7 MB
EQUIP BLDG B 5.0 MB
EQUIP BLDG C 4.9 MB
EQUIP BLDG D 4.4 MB
FUEL ISLAND 2.7 MB
GENERATOR ENCL 1.8 MB
Signage 114.7 MB
  Bid Manual (click to expand/collapse)
Name Size
GUC BID Manual 195.5 MB