Greenville Utilities Commission

This project includes the construction of three buildings of a total of approximately 142,000 sq ft. Construction includes slab on grade, structural steel, and brick and architectural CMU veneer, TPO roof system, and pre-engineered metal buildings. There will be a fuel island constructed and aluminum canopies. Interior partitions are metal stud with gypsum board.
No files available